demand Early Season Heat Stressed The Eastern Interconnection PJM, NYISO, ISO-NE, and IESO exceeded last summer's peak demand, and did so before July. With load climbing beyond forecast, we break down how each region responded and navigated this record-breaking early-season heat event.
ISO-NE Tariffs Challenge the Interconnected Northeast New York and New England are heavily interconnected with the Canadian grid, importing cheaper and cleaner power than internal generation. Tariffs are driving uncertainty in both operations and planning.