Grid Status Exports
  • Home
  • ERCOT
  • CAISO
  • Batteries
  • Solar
  • SPP
  • About
  • GridStatus.io
Sign in Subscribe

records

A collection of 4 posts
Another Record Bites the Dust
ERCOT

Another Record Bites the Dust

At the end of July 2026, ERCOT managed to break its existing solar, battery discharge, load, and net load records in the span of 2 days. We're taking a look at the details, how everything tied together, and the future of the Texas grid.
03 Aug 2026 9 min read
Early Season Heat Stressed The Eastern Interconnection
demand

Early Season Heat Stressed The Eastern Interconnection

PJM, NYISO, ISO-NE, and IESO exceeded last summer's peak demand, and did so before July. With load climbing beyond forecast, we break down how each region responded and navigated this record-breaking early-season heat event.
27 Jun 2025 18 min read
West Texas and Northern Virginia, Harbingers of Load Growth
ERCOT

West Texas and Northern Virginia, Harbingers of Load Growth

Prior to the current datacenter demand explosion, far west Texas in ERCOT and Dominion in PJM were already experiencing significant demand growth.
18 Mar 2025 4 min read
ERCOT is on a hot streak during a cold winter
batteries

ERCOT is on a hot streak during a cold winter

ERCOT set new records in load, net load, solar, prices, and battery discharge within a few days, let's explore the data.
20 Feb 2025 2 min read
Page 1 of 1
Grid Status Exports © 2026
  • Sign up
  • GridStatus.io
  • MISO
  • PJM
  • NYISO
  • Forecasts
  • Nuclear
  • Renewables
  • Outages
  • Emissions
  • ISO-NE
  • Natural Gas
Powered by Ghost